Reading
Recording since 29 Nov 2026. Scores cover the first day and settle as the record builds to 90 days.
Read 11:45
Reading
Latest changes
UK rapid chargers · 50kW and above
The law says rapid chargers must work 99% of the time. We read every charge point every five minutes and publish the real figure.
Read at 11:45 on 29 Nov 2026. 13.4% of charge points with a status were out of order.
01Network table
Share of time each network’s rapid charge points were working since recording began on 29 Nov.
02The whole network, right now
Every rapid charging site we watch, placed where it stands. Green is fully working. Amber has a charge point out of order. Orange has nothing working.
Site
Point at a dot
Each dot is one rapid charging site. Click one to open it.
Largest sites with nothing working
03All networks, day by day
Every watched charge point added together. The ruled line is the 99% the law asks for.
The line starts tomorrow. It needs two days of recordings to draw. Today’s figure so far: 87.08% working.
04Out of order longest
Charge points reported out of order today, by how long ago the operator last changed their status.
05How we measure
Operators must publish each charge point’s status as open data. We collect it every five minutes, around the clock.
Every change of status is stored with its time. Working means free, in use or reserved. Broken means out of order or not working.
We use the sum set out in the regulations. Blocked bays and readings we could not take are left out, never counted as broken.